TY - JOUR T1 - A passive cooling wind tower with heat pipe technology: CFD, wind tunnel and field test JO - Applied Energy PY - 2016/01/15 AU - Calautit JK AU - Hughes BR ED - DO - DOI: 10.1016/j.apenergy.2015.10.045 VL - 162 SP - 460 EP - 71 Y2 - 2024/12/22 ER -